Communities

Writing
Writing
Codidact Meta
Codidact Meta
The Great Outdoors
The Great Outdoors
Photography & Video
Photography & Video
Scientific Speculation
Scientific Speculation
Cooking
Cooking
Electrical Engineering
Electrical Engineering
Judaism
Judaism
Languages & Linguistics
Languages & Linguistics
Software Development
Software Development
Mathematics
Mathematics
Christianity
Christianity
Code Golf
Code Golf
Music
Music
Physics
Physics
Linux Systems
Linux Systems
Power Users
Power Users
Tabletop RPGs
Tabletop RPGs
Community Proposals
Community Proposals
tag:snake search within a tag
answers:0 unanswered questions
user:xxxx search by author id
score:0.5 posts with 0.5+ score
"snake oil" exact phrase
votes:4 posts with 4+ votes
created:<1w created < 1 week ago
post_type:xxxx type of post
Search help
Notifications
Mark all as read See all your notifications »
Q&A

How to use a static rope as a tether at the anchor of a top rope climb?

+1
−0

I just recently returned from a course where we utilized a static rope to construct a top-rope anchor from a top-accessed ledge: the system was like that described in this answer - the resulting configuration of the rope being a "V" with an additional line running from one of the apexes turning the static configuration into an "N".

The actual anchor legs are accomplishable via a number of means; however, when establishing the instructor tether, I am unsure of what knot is acceptable when going over the ledge and transferring to the pre-setup rappel.

Typically, one leg is wrapped around a tree (I climb in the Southeast) and is secured with a Bowline (not enough for a tail). The length of the rope is run down to ledge and back to another anchor point (in this case a tree), creating the "V".

What I've typically done is used doubled cordellete around the tree (redundancy) with an Overhand on a Bight. A locking carabiner is put through that Bight and the final leg is tied to that using a clove hitch.

enter image description here

Image source

Is it appropriate to use the tail (on the right; as an example) of the adjustable hitch for my instructor tether? If not, how would you configure your use of the natural anchors to provide you with a tether for managing the site?

History
Why does this post require attention from curators or moderators?
You might want to add some details to your flag.
Why should this post be closed?

This post was sourced from https://outdoors.stackexchange.com/q/19028. It is licensed under CC BY-SA 3.0.

0 comment threads

2 answers

+1
−0

This seems like a dangerous setup for using a static rope. If the top right anchor fails as you are weighting the instructor tether, the instructor could fall a meter or so. On a dynamic rope, this is no problem, but on a static line, this could be dangerous.

If there is enough tail left, I would probably connect the instructor tether to the center point, leaving a little slack between the clove hitch on the top right anchor and the eight on a bight (or whatever knot floats your boat) knot that connects the instructor tether to the center point.

History
Why does this post require attention from curators or moderators?
You might want to add some details to your flag.

This post was sourced from https://outdoors.stackexchange.com/a/19042. It is licensed under CC BY-SA 3.0.

0 comment threads

+0
−0

Here is what I have done in the past and have demonstrated for others.

Attach yourself to the tether with a Gri-Gri and tie backup knots beneath you to prevent a catastrophic failure of the Gri-Gri losing its grip and you sliding all the way down the rope. Its unlikely that the Gri-Gri would fail, but you still want to tie the knots in case and as good practice. The point of tieing the knots is that if the Gri-Gri were to slip, the knots would stop you from sliding past them.

Just a simple figure-eight on a bight or an overhand on a bight will work (make the bights good and large).

The Gri-Gri makes it really easy to go up and down the rope as you need and it means you don't need to constantly adjust knots in the rope. The backup knots are really easy to tie and they shouldn't get weighted, making them easy to untie.

History
Why does this post require attention from curators or moderators?
You might want to add some details to your flag.

0 comment threads

Sign up to answer this question »