Communities

Writing
Writing
Codidact Meta
Codidact Meta
The Great Outdoors
The Great Outdoors
Photography & Video
Photography & Video
Scientific Speculation
Scientific Speculation
Cooking
Cooking
Electrical Engineering
Electrical Engineering
Judaism
Judaism
Languages & Linguistics
Languages & Linguistics
Software Development
Software Development
Mathematics
Mathematics
Christianity
Christianity
Code Golf
Code Golf
Music
Music
Physics
Physics
Linux Systems
Linux Systems
Power Users
Power Users
Tabletop RPGs
Tabletop RPGs
Community Proposals
Community Proposals
tag:snake search within a tag
answers:0 unanswered questions
user:xxxx search by author id
score:0.5 posts with 0.5+ score
"snake oil" exact phrase
votes:4 posts with 4+ votes
created:<1w created < 1 week ago
post_type:xxxx type of post
Search help
Notifications
Mark all as read See all your notifications »
Q&A

How to "store" excess rope in a running belay?

+0
−0

A recent question made me wonder how a running belay is really done.

Suppose you are climbing an alpine route, maybe of difficulty UIAA 5. You encounter a stretch of 100m of UIAA 1 terrain with no visible difficult parts and ample opportunity to place protection (or even some bolts). It is possible to do it in two or three pitches, but from what I heard, this would be the perfect candidate for simul-climbing with a running belay.

As far as I understand it, the leader would start climbing on belay and placing protection. After a suitable distance, the second would clean the anchor and follow while the leader continues.

I don't suppose the second would wait until the whole rope is out (i.e. until the leader climbed about 50m), but tie into the middle of the rope and somehow store the excess rope somehow. How would he do that?

History
Why does this post require moderator attention?
You might want to add some details to your flag.
Why should this post be closed?

This post was sourced from https://outdoors.stackexchange.com/q/17517. It is licensed under CC BY-SA 3.0.

0 comment threads

2 answers

You are accessing this answer with a direct link, so it's being shown above all other answers regardless of its score. You can return to the normal view.

+1
−0

The way I have always done that is wrap the extra rope around my self. It goes over one shoulder and then under the the arm on the other side. Then, in addition to tying it at the end of the rope with a figure-eight like normal, you tie another figure-of-eight on a byte and clip that to your belay loop with a locking carabiner.

History
Why does this post require moderator attention?
You might want to add some details to your flag.

0 comment threads

+0
−0

What you want to learn to tie is a Kiwi Coil.

enter image description here

A kiwi coil is an alpine coil you manage and wear while still tied into the end of your rope. Tie in as you normally would while climbing or glacier walking, then coil as much rope as you want around your body. Tie off in the middle of the rope by passing a bight of rope through your belay loop and around the coil, finish it off by tying an overhand on a bight onto the rope leading to your partner (back up by clipping the tail end of your bight to your belay loop). If you tie it right, you can safely take a fall and all the force will go into your harness as if on the end of the rope.

You can keep smaller coils (3-5m) in your hand too, tie a "magic knot" (slip knot) to hold in your hand as a handle between your hand coil and your partner, this helps you keep a better grip on the rope and coil, and in the event you need to drop the coil, the slip knot will come undone as soon as the rope goes taught.

If you have a long rope, each climber can carry a kiwi coil, distributing the extra rope between the two of you.

History
Why does this post require moderator attention?
You might want to add some details to your flag.

This post was sourced from https://outdoors.stackexchange.com/a/17520. It is licensed under CC BY-SA 3.0.

0 comment threads

Sign up to answer this question »